Florida travel guide

Construction report from Cape Coral: tips and experiences

drywallFlorido construction worker small18. October 2016

After the wall construction is completed with the plasterboard, the joints and gaps are closed. To do this, the plasterer stilts lay on, so they do not constantly climb the ladder up and down the high walls and can move flexibly through the rooms. Within a few days the house looks quite comfortable.

trockenbau3

trockenbau4

trockenbau5

trockenbau2

trockenbau6

trockenbau7