German Dutch English French italian japanese portuguese russian spanish
before slab1Florido builders small12. to 14. June 2016

After removal of the pipe laying in the soil the foundation is poured with sand which is compacted by vibratory plate. Now it's time for the inspector who performs a compaction test. It measures whether the predetermined degree of compaction on the plan was adhered to.

If so, more can be built. Now, a foil as vapor barrier (Vapo Barrier) is laid over the entire ground plan. It prevents later that the rising from the ground water vapor enters the house. In this film finally coming mats coverage of steel mesh, which ensure that future base plate does not tear. So far everything is now ready for casting the slab (bottom panel).

before slab2before slab3before slab4before slab5before slab6before slab7before slab8

Next post


Foregoing contributions (in chronological order):




Normal Color session, any part 1: Just do not erdfarben

The architect and our plan


Wed, Sep 19, 2018

Search

Partly Cloudy

32 ° C

Cape Coral, Fl

Partly Cloudy

Humidity: 54%

Wind: 11.27 km / h

  • 18 September 2018

    Thunderstorms 34 ° C 24 ° C

  • 19 September 2018

    Thunderstorms 32 ° C 25 ° C

Best pictures

Send us your most beautiful holiday pictures of florido@florida-scout.com. We present it here.
Bonita Springs
Anna Maria Iceland
Caloosahatchee River
Magic Kingdom Parade in Orlando
Miami Beach